OSIS GROUP
View all projects

Industrial Concrete Flooring

Hamad Hospital - Apron Floor

Hamad Hospital - Apron Floor
Country
State of Qatar
Location
Doha
Area
19,000 m²
Service
Industrial Concrete Flooring
Floor type
FM3
Year
2013

The Hamad Hospital infrastructure project necessitated the construction of an expansive 19,000 m² apron floor designed to withstand high-frequency heavy vehicle traffic and emergency transport logistics. The primary challenge resided in the scale of the pour within a sensitive medical environment, where dust control, noise mitigation, and strict adherence to hygiene standards were paramount.

In addition to environmental constraints, the project demanded a specific FM3 flatness specification as per TR34 guidelines to ensure the safe operation of logistical equipment. Developing a flooring solution that could manage significant thermal expansion while maintaining structural integrity under heavy localized loads was critical for the long-term functionality of the hospital's primary service area.

Let's build something together

Have an industrial flooring or construction project? Contact our technical team.

Request a quote