OSIS GROUP
View all projects

Industrial Concrete Flooring

Logistics Village Phase 4

Logistics Village Phase 4
Country
State of Qatar
Location
Doha
Area
45,000 m²
Service
Industrial Concrete Flooring
Floor type
DM2
Year
2014

Gulf Warehousing Company (GWC) required a high-specification expansion for Phase 4 of their Logistics Village in Doha, necessitating 45,000 m² of advanced industrial flooring. The primary challenge was the requirement for DM2 floor flatness according to TR34 standards, essential for the high-reach racking systems and Very Narrow Aisle (VNA) operations planned for the facility.

The project faced significant logistical pressures, including the harsh environmental conditions of Doha, which can adversely affect concrete setting times and structural integrity. Furthermore, the client required a floor capable of sustaining high-load intensities from heavy-duty forklifts while maintaining long-term durability and minimal maintenance requirements in a high-throughput logistics environment.

Let's build something together

Have an industrial flooring or construction project? Contact our technical team.

Request a quote